BACKSHOP
In 2020 Norm and Susan Wizner donated three 40’ shipping containers to North Georgia Live Steamers with the purpose of using the containers as shop and meeting space. By November 2021 the concrete forms were installed, and the three containers set into place. Throughout 2022 items for the shop were collected including a mill donated by Ethel Nicols. The plan for 2023 is to weld the containers together and cut out the inner walls in order for space to start coming together as a usable space. Here is just some of the activities around the building of the back shop.
The momentum behind the clubhouse and workshop project is really starting to build — and this past Saturday proved it.
In an impromptu work session, Wes and Norm came out and made tremendous progress preparing the next section of the container for repairs. Thanks to their hard work, we are now in a position for the repair work to take place sometime this week or during our next official workday on Saturday, May 30th.
The beautiful weather helped set the stage for an incredibly productive workday on Saturday, May 16th!
The momentum actually began Friday evening when Wes and John arrived early to help prepare for Saturday’s activities. On Saturday, the hardworking crew of John, Wes, Gene, Norm, and Robby tackled several important items on the clubhouse and workshop project.
Despite the cold weather over the past few weeks, progress continues across the railroad thanks to our dedicated Routen Tuten Workday leader. While most of us have been bundled up, work on the ramp track leading to the future shop has been moving full steam ahead.
Some refinements to the original design have been made, and John is once again doing what he does best. The updated plan narrows the ramp and adds a 20-foot level section near the top, creating a stable platform to improve safety and reduce loose rock and debris. Over the past several weekends, this new design has steadily taken shape as existing blocks were carefully removed and repositioned into their new layout.
To keep this momentum going, the next phase of work will involve relocating a switch and constructing a new switch off the passenger line to support the shop ramp. Be on the lookout for an upcoming workday announcement as we prepare for this important step. As always, thank you to everyone who continues to contribute their time, effort, and expertise.
With the containers now positioned exactly where we want them, the clubhouse and workshop project is gaining momentum once again—and the progress is really starting to show.
On Saturday, November 22nd, Wes, Norm, and Robby spent the day on-site taking advantage of the warm November weather to knock out several important tasks. Wes and Robby focused on the roof, kicking off the process of making Containers One and Two watertight, while Norm worked on sealing up the end sections. These steps aren’t the finish line, but they’re major strides toward getting the entire structure fully weather-ready.ing workdays!
Big progress on the clubhouse and workshop project this past Saturday as the crew, which consisted of John, Scott, Kenneth, Tyler, Robby, and Norm, finished electrical, finish painting ceiling and walls, and installed lights. The crew also placed clamps on the two containers in preparation of sealing the containers together. It was determined container two needs to be moved a little before the clamps can be fully tightened. Until then container two needs to have several items moved out and placed in the blue container in order to make room for work to begin on cutting out the inner walls and insulating container two. Dates for the next workday are being planned for February so stay tuned for details.
Speaking of February our next club meeting will be Saturday, February 1st at the railroad.
A workday is planned on the Clubhouse and Workshop project this Saturday, January 25th starting at 8:30 a.m. The heat is running, and container is warmer than you might think inside. The plan is to work on electrical and finish painting the last bit of walls and ceiling in container one. Over the next several workdays we will begin getting container 1 and 2 ready for fastening them together and removing the interior wall. In case you haven’t already respond to the clubhouse workday survey that was sent out a few weeks ago please do so we can make plans. The official push on the project starts February 1st with the hope of having the first two containers attached and opened up before our first run day in April.
After months of debate on how to move the blue container to a new location on the property it is finally done with the help of Wes and his team.
This past Wednesday a small crew go together to install the signal mast that Dave Levy is working on restoring along with moving the mill that Ethel Nicol’s donated to the club. The group consisted of Ben, Rick, Norm, Wes, Gene, “Bob 2”, Dave L. and Robby. While Ben, Rick, and Norm loaded up the mill at Norm’s shop the crew waiting at the site, Wes, Dave L, Gene, and Robby, worked on the signal mast, and spreading some dirt and gravel for the member container project.
The day has finally come to take delivery and place containers that will become part of our shop and a member container. We will be placing three 40’ containers side by side and then place a 40’ high cube next to the member container area on the railroad. Bring tools, lunch, water, and a good sense of humor we are probably going to need all we can get as thing come together.
On Monday, November 8th a small crew went to the site to complete the groundwork for the new club workshop containers and next member container. The crew, which consisted of Norm, Ben, “Bob”, Robby, Wes, and our favorite delivery guy Bill C., from Sheppard Trucking, who brought us about 18-tons of crusher run that was placed in between the forms where the shop containers are going. Rick also stopped by to jump into the story telling while Ben and “Bob” did a lot of the work. Next step is to take delivery and place the containers which is scheduled for Friday, November 19th. If you are looking for something to do on that Friday, come out and join in on the fun.
On December 17th Norm and Susan W. donated and delivered two 40’ containers to the site. The final resting place of the containers will be in the east loop area of the railroad and will eventually represent a 16 x 40 shop facility for the club.