East Loop Drain Repair Workday Recap for Saturday, August 16th

Work has begun to repair the East Loop drain. This past Saturday, Wes, Ken, “Bob’s” distant cousin, and the team brought in the big guns to repair the east loop drain once and for all. The goal is to have the drain repaired before the Club Fun Hot Summer Nights event on Saturday, August 23rd.

This past Saturday, the crew dug out the path for the culverts to be installed, with forms going in on Sunday and concrete being poured on Tuesday, August 19th. The goal is to have the track panels back in place by Friday. For that to happen, Wes, Ken, and the crew are asking for help from anyone available. Please reach out to Wes to let him know when you are available so he can align it with planned work.