2022 RECAPS
30 Most Recent Workday Recaps
This past Wednesday a small crew go together to install the signal mast that Dave Levy is working on restoring along with moving the mill that Ethel Nicol’s donated to the club. The group consisted of Ben, Rick, Norm, Wes, Gene, “Bob 2”, Dave L. and Robby. While Ben, Rick, and Norm loaded up the mill at Norm’s shop the crew waiting at the site, Wes, Dave L, Gene, and Robby, worked on the signal mast, and spreading some dirt and gravel for the member container project.
Over the past month or so we’ve had a lot of activity around the railroad. From working on our next member container, driveway drain, run day preparation and even preparing for the installation of a restored railroad signal head. Here are a few pictures to highlight some of the activities.
A special thanks to all of the club members who have volunteered to make these project happen.
With all the heat and some rain over the past few of week’s progress on the next member container had slowed but things got back on track over the past week. Last week Bill Cross from Shepphard Trucking delivered gravel but could not be dumped in the location of the container because of ground conditions. Fast forward to yesterday Wes went out and compacted and smoothed out the area the gravel needs to be spread so today Bill Cross could come out and spread gravel. The next step for the container is to schedule the delivery and then the real fun begins. On Tuesday, Wes also dug out around the driveway drain so we can get the drain cover installed.
Over the past two weekends a couple of different work crews went to the site to continue work on the next member container. On Saturday, July 9th the crew with help from Gene and his trusty bobcat did grading work in the for the new container, even with a little early rain, in preparation of gravel in the next week or so. Wes topped off the work during the week by marking off the general placement of the container. Then on Saturday, July 16th the plan had been to cut grass but since Wes came out on Thursday and took care of that, so the work crew ended up building much needed switch templates to make it a little easier to visualize future track placement. Coming up over the next couple of weeks the gravel will be delivered, and the container will be set.
A small crew went to the site this past weekend to take out some trees in preparation of the next member container. The crew consisted of Wes, Brandon, Norm, Ben, and “Bob”. Some more work is still needed to finish preparing the site, but the guys are getting close. The crew will be looking for some help building track panels in the coming weeks along with figuring out exactly how the track will be laid out. More details to come.
The first workday of the 2022 season is in the books. The crew spent the day installing about 200 feet of track and two switches for the next member container. The crew consisted of Calvin, John T., Norm, Ben, “Bob”, David E., Thomas K., Gene, Robby, Rick, Wes, and Andrew. The day went well even with the normal heckling and second guess what we were doing. By the end of the day things came together well and this project is now about 90% complete.
This past weekend, Saturday, January 29th and Sunday, January 30th, North Georgia Live Steamers displayed at the Trains, Trains, Trains! event at the Southern Museum of Civil War and Locomotive History in Kennesaw. What an incredible event giving us the opportunity to meet so many people interested in history and learn about our hobby. The museum was so generous to give us a space that was in the main walkway providing us to meet many of the more than 2,000 visitors. A big thanks to the museum staff, organizers, and NGLS club members for displaying and working the booth.