Midweek workday this past Wednesday, November 9th

This past Wednesday a small crew go together to install the signal mast that Dave Levy is working on restoring along with moving the mill that Ethel Nicol’s donated to the club. The group consisted of Ben, Rick, Norm, Wes, Gene, “Bob 2”, Dave L. and Robby. While Ben, Rick, and Norm loaded up the mill at Norm’s shop the crew waiting at the site, Wes, Dave L, Gene, and Robby, worked on the signal mast, and spreading some dirt and gravel for the member container project.

This past Wednesday a small crew go together to install the signal mast that Dave Levy is working on restoring along with moving the mill that Ethel Nicol’s donated to the club. The group consisted of Ben, Rick, Norm, Wes, Gene, “Bob 2”, Dave L. and Robby. While Ben, Rick, and Norm loaded up the mill at Norm’s shop the crew waiting at the site, Wes, Dave L, Gene, and Robby, worked on the signal mast, and spreading some dirt and gravel for the member container project.

Once the crew arrived with the mill it was time to get the mill off the trailer and set inside the shop container. The team made it look easy with the help of Rick, Ben, Gene, and “Bob 2”. Now that the mill is in place it’s time to start working on welding the containers together and convert the containers into shop space.

While Gene and “Bob 2” were at the site they took time to clean up the driveway and the new drain that was installed earlier this year. Now the water should flow nicely into the drain and into the east field and the member container has some needed dirt and crusher run. Next step is to start building switches and track panels so the container can get completed during the off season.

Read More
Latest News, Work Day, Backshop, Shop Project Construction North Georgia Live Steamers Latest News, Work Day, Backshop, Shop Project Construction North Georgia Live Steamers

Shop container delivery and placement workday on Friday, November 19th

The day has finally come to take delivery and place containers that will become part of our shop and a member container. We will be placing three 40’ containers side by side and then place a 40’ high cube next to the member container area on the railroad. Bring tools, lunch, water, and a good sense of humor we are probably going to need all we can get as thing come together.

The day has finally come to take delivery and place containers that will become part of our shop and a member container. We will be placing three 40’ containers side by side and then place a 40’ high cube next to the member container area on the railroad. Bring tools, lunch, water, and a good sense of humor we are probably going to need all we can get as thing come together.

Read More
Members Only, Latest News, Backshop, Shop Project Construction North Georgia Live Steamers Members Only, Latest News, Backshop, Shop Project Construction North Georgia Live Steamers

Impromptu workday recap for Monday, November 8th

On Monday, November 8th a small crew went to the site to complete the groundwork for the new club workshop containers and next member container. The crew, which consisted of Norm, Ben, “Bob”, Robby, Wes, and our favorite delivery guy Bill C., from Sheppard Trucking, who brought us about 18-tons of crusher run that was placed in between the forms where the shop containers are going. Rick also stopped by to jump into the story telling while Ben and “Bob” did a lot of the work. Next step is to take delivery and place the containers which is scheduled for Friday, November 19th. If you are looking for something to do on that Friday, come out and join in on the fun.

On Monday, November 8th a small crew went to the site to complete the groundwork for the new club workshop containers and next member container. The crew, which consisted of Norm, Ben, “Bob”, Robby, Wes, and our favorite delivery guy Bill C., from Sheppard Trucking, who brought us about 18-tons of crusher run that was placed in between the forms where the shop containers are going. Rick also stopped by to jump into the story telling while Ben and “Bob” did a lot of the work.  Next step is to take delivery and place the containers which is scheduled for Friday, November 19th.  If you are looking for something to do on that Friday, come out and join in on the fun.

The crew also pulled out a signal poll and trimmed it down to size in preparation for a restored signal head that Dave L. recently completed will be mounted on this poll. Looking forward to seeing more railroad structures around the railroad in the future.

Read More
Latest News, Members Only, Backshop, Shop Project Construction North Georgia Live Steamers Latest News, Members Only, Backshop, Shop Project Construction North Georgia Live Steamers

Delivery of 2 x 40' containers to be converted into our NGLS Shop

On December 17th Norm and Susan W. donated and delivered two 40’ containers to the site. The final resting place of the containers will be in the east loop area of the railroad and will eventually represent a 16 x 40 shop facility for the club.

On December 17th Norm and Susan W. donated and delivered two 40’ containers to the site. The final resting place of the containers will be in the east loop area of the railroad and will eventually represent a 16 x 40 shop facility for the club. The plan will be to also provide a couple of sidings to feed the shop area so it will be accessible to the railroad giving us a great deal of flexibility to bring equipment in and out of the space for repairs and more. Thank you to Norm and Susan for the donation and we look forward to enjoying this space for years to come.