Work Day, Members Only North Georgia Live Steamers Work Day, Members Only North Georgia Live Steamers

Nicol bridge retaining wall project made surprise progress on Wednesday.

On Wednesday Wes and Norm stopped by the site and worked on cutting the container side panels that are going to be used to build a retaining wall west of the Nicol bridge. The pair not only cut the panels but also placed the fence posts in the ground and will be fastening the panels to the posts soon. While we don’t have an official workday planned for this weekend if you are available this weekend a crew is planning on being onsite to work on the wall starting at 8:30 a.m. If you are able to come out this Saturday to help, be aware that a big event will happening at the Steeplechase so approach the area with caution and let the traffic details know you are going to the railroad.

On Wednesday Wes and Norm stopped by the site and worked on cutting the container side panels that are going to be used to build a retaining wall west of the Nicol bridge. The pair not only cut the panels but also placed the fence posts in the ground and will be fastening the panels to the posts soon. While we don’t have an official workday planned for this weekend if you are available this weekend a crew is planning on being onsite to work on the wall starting at 8:30 a.m. If you are able to come out this Saturday to help, be aware that a big event will happening at the Steeplechase so approach the area with caution and let the traffic details know you are going to the railroad.

One final note about future planned workday events. We have a special work week planned for April 1st through 5th. The plan during the week is work on the clubhouse and workshop container project. We will be building a stud wall in the first container so we can complete the electrical panel installation and get power into the container. This will allow us to have what is needed in the container for future workdays to begin the next phase of work which includes building out more internal walls in the first two containers as our clubhouse and workshop space begins to finally take shape. Other items are planned and if you are available to come out one or more days, please let us know.

Our next club meeting is Saturday, April 6th at 1 p.m. and our first Public Run Day Prep Day will also take place on Saturday, April 6th.

Read More
Members Only North Georgia Live Steamers Members Only North Georgia Live Steamers

Are you planning on visiting other railroads this spring?

We are looking to see who is planning on visiting other railroads this spring. We are hoping to have a good showing at other locations and to help promote our Fall meet. Please fill out the form below and let us know.

We are looking to see who is planning on visiting other railroads this spring. We are hoping to have a good showing at other locations and to help promote our Fall meet. Please fill out the form below and let us know.

Read More
Latest News, Members Only, Work Day North Georgia Live Steamers Latest News, Members Only, Work Day North Georgia Live Steamers

Friday Nights Rain didn’t keep some from working on Saturday, March 9th

Friday’s overnight rain didn’t deter a small group from showing up Saturday morning for a workday. John, Wes, and Scott started out early Saturday morning by taking care of some items with the “Grandma Line”. They worked on the retaining wall which also means they had to haul in dirt and gravel with wheelbarrows. Robby showed up and brought back one of the new club riding cars to the site. He spent the past few months cleaning and repainting the car while Norm cleaned up the trucks. The riding car is now ready for operation for the 2024 season.

The crew also worked on plans for the retaining wall that needs to be installed near the west end of the Nicol bridge.

Friday’s overnight rain didn’t deter a small group from showing up Saturday morning for a workday. John, Wes, and Scott started out early Saturday morning by taking care of some items with the “Grandma Line”. They worked on the retaining wall which also means they had to haul in dirt and gravel with wheelbarrows. Robby showed up and brought back one of the new club riding cars to the site. He spent the past few months cleaning and repainting the car while Norm cleaned up the trucks. The riding car is now ready for operation for the 2024 season.

The crew also worked on plans for the retaining wall that needs to be installed near the west end of the Nicol bridge. We are going to take the end pieces that came out of the grey container project from a couple of years ago and cut them down to about 16 inches tall so we can then use them as part of the retaining wall structure. The plan is to get them cut and ready for installation by Saturday, March 23rd. We will need help hauling dirt and gravel using wheelbarrows to the retaining wall in order to complete this project. We will also be installing about 100 feet of fencing as well. Because this project needs to be completed before our April run day, we will also be doing work on Saturday, March 30th to finish this and other projects.

If all of this wasn’t enough the real fun part of the day was when John and Wes started working on the west end water line extension by figuring out a way to work smarter and not harder. The pair had been using two wagons to bring crush and run to the work area which was a slow process. The two put their heads together and decided to leverage the new little electric switch to bring material to John while Wes loaded the wagons. You have to watch the videos to really appreciate the great use of this new switcher and pulling of wagons full of material back and forth to the job site. Needless to say, this approach saved John and Wes a great deal of time. Scott jumped in and helped by operating the locomotives wireless controller from the comfort of well his chair.

John and Robby also spent time walking the “Grandma Line” as the area will see some major progress in the next month or so. The plan is to install a temporary crossing on the west end so a bobcat can bring dirt and other supplies into the area. Weather permitting this will take place by the end of March and will really allow this project to pick up steam. Keep an eye out for updates on what John and Wes will be working on next. This is a great opportunity to get involved.

Other photos from The day

Read More
Members Only North Georgia Live Steamers Members Only North Georgia Live Steamers

Help Requested from Steamers to perform an operational check on the club steamer.

We are in need of a couple of steamers to help perform an operational check on the locomotive while Bob is out. Please let Robby know if you are available so we can coordinate a team to do the operational check in March. The big thing that Bob has asked that we verify is to make sure the lubricator is operating correctly along with all of the other normal checklist items.

We are in need of a couple of steamers to help perform an operational check on the locomotive while Bob is out. Please let Robby know if you are available so we can coordinate a team to do the operational check in March. The big thing that Bob has asked that we verify is to make sure the lubricator is operating correctly along with all of the other normal checklist items.

Read More
Work Day, Railroad Projects, Members Only, Latest News North Georgia Live Steamers Work Day, Railroad Projects, Members Only, Latest News North Georgia Live Steamers

Here is a list of current workdays and projects on the calendar for the month and beyond.

Over the course of the month, we plan on working on a project or two around the railroad. In order to give everyone a chance to find a project they are interested in helping with we are sending out monthly emails listing projects and other activities going on around the railroad. Don’t forget to invite family, friends, neighbors, and anyone you know who likes trains. For more details about some of the projects we are working on click on the “Railroad Project List” button below for a complete list. Don’t forget to bring tools, lunch, plenty to drink, and a good sense of humor. Don’t forget we have other fun days planned throughout the month and year as well so don’t forget to visit our calendar page for a complete list of everything going on around the railroad.

Over the course of the month, we plan on working on a project or two around the railroad. In order to give everyone a chance to find a project they are interested in helping with we are sending out monthly emails listing projects and other activities going on around the railroad. Don’t forget to invite family, friends, neighbors, and anyone you know who likes trains. For more details about some of the projects we are working on click on the “Railroad Project List” button below for a complete list. Don’t forget to bring tools, lunch, plenty to drink, and a good sense of humor. Don’t forget we have other fun days planned throughout the month and year as well so don’t forget to visit our calendar page for a complete list of everything going on around the railroad.

All Dates are subject to change and weather conditions

Read More
Members Only, Club Fun Day, Latest News North Georgia Live Steamers Members Only, Club Fun Day, Latest News North Georgia Live Steamers

Club Fun Day Recap for Saturday, March 2, 2024

The weather cleared up and the day ended up being incredible. The turnout was small, but the fun was large. Peter and Robby ran most of the day. Wayne L, Norm, Rick, Dave L, and Ethel also stopped by. Dave ran his electric switcher for a while and Wayne took a ride on Peter’s train. We did run into an issue with the switch that was moved last weekend on the west end of the Nicol bridge. Norm brought the newly rebuilt switcher out, a big thanks to Dave L for completing this project, and brought the MOW car out to the switch that was being repaired by Peter, Rick, Robby, and Norm. Overall, the day was a success, and the railroad ran great. It was also determined that a small retaining wall needs to be installed near the west end of the Nicol bridge in order prevent loss of ballast around the track. This is the same area that we performed track repair last weekend.

The weather cleared up and the day ended up being incredible. The turnout was small, but the fun was large. Peter and Robby ran most of the day. Wayne L, Norm, Rick, Dave L, and Ethel also stopped by. Dave ran his electric switcher for a while and Wayne took a ride on Peter’s train. We did run into an issue with the switch that was moved last weekend on the west end of the Nicol bridge. Norm brought the newly rebuilt switcher out, a big thanks to Dave L for completing this project, and brought the MOW car out to the switch that was being repaired by Peter, Rick, Robby, and Norm. Overall, the day was a success, and the railroad ran great. It was also determined that a small retaining wall needs to be installed near the west end of the Nicol bridge in order prevent loss of ballast around the track. This is the same area that we performed track repair last weekend.

Read More
Club Fun Day, Live Steam Railroad Club, Members Only North Georgia Live Steamers Club Fun Day, Live Steam Railroad Club, Members Only North Georgia Live Steamers

Our 2nd Almost Monthly Club Fun Day of 2024 will be Saturday, March 2nd

Our 2nd Almost Monthly Club Fun Day will be Saturday, March 2nd. The day is intended for club members, guests, and those who are in the hobby to come out and enjoy a day of running trains. Come when you want and stay as long as you want. If you plan on coming out, please let us know by clicking here.

Our 2nd Almost Monthly Club Fun Day will be Saturday, March 2nd. The day is intended for club members, guests, and those who are in the hobby to come out and enjoy a day of running trains. Come when you want and stay as long as you want. If you plan on coming out please let us know by clicking here.

Read More
Latest News, Members Only, Work Day North Georgia Live Steamers Latest News, Members Only, Work Day North Georgia Live Steamers

Major workday recap for Saturday, February 24, 2024

What an incredible workday we had on Saturday. The weather was incredible, and we had more than a dozen volunteers come out which made the day a huge success. Because of the turnout we completed the major track repair on the west end of the railroad along with installing a new switch on the mainline near the west end of the water line. The crew consisted of John T, John, Calvin, Scott, Robby, Peter, Gene, Rick, Ben, Thomas, Paul, Tyler, Norm, Dale, and “Bob III”. The crew also took care of building more than a dozen straight panels for the “Grandma Line” and started building a new switch as well. Rick and “Bob III” took care of leveling the gravel near member container 3 which means we can now schedule the move of the blue container. They also cleaned up a trench that had been dug during our electrical project workday a few weeks ago.

What an incredible workday we had on Saturday. The weather was incredible, and we had more than a dozen volunteers come out which made the day a huge success. Because of the turnout we completed the major track repair on the west end of the railroad along with installing a new switch on the mainline near the west end of the water line. The crew consisted of John T, John, Calvin, Scott, Robby, Peter, Gene, Rick, Ben, Thomas, Paul, Tyler, Norm, Dale, and “Bob III”. The crew also took care of building more than a dozen straight panels for the “Grandma Line” and started building a new switch as well. Rick and “Bob III” took care of leveling the gravel near member container 3 which means we can now schedule the move of the blue container. They also cleaned up a trench that had been dug during our electrical project workday a few weeks ago.

With all that was done an update to our March workday plans will be updated to include plans for our next project including some work on the clubhouse and shop project. A big thank you to everyone who came out because nothing happens without our members and volunteers.

Read More
Latest News, Members Only, Work Day Scheduled North Georgia Live Steamers Latest News, Members Only, Work Day Scheduled North Georgia Live Steamers

Plans for this weekend's Major Track Repair on Saturday, February 24th at 8:30 a.m.

The weather is looking great for our major track repair project for this Saturday. In order to help make the day as productive as possible we will need to take a divide and conquer approach. The list below is what our needs are and areas you can jump in and help with. As you might expect this isn’t a complete list so if you see something you can do come on out and help wherever you can.

The weather is looking great for our major track repair project for this Saturday. In order to help make the day as productive as possible we will need to take a divide and conquer approach. The list below is what our needs are and areas you can jump in and help with. As you might expect this isn’t a complete list so if you see something you can do come on out and help wherever you can.

Crew 1: Railroad Tie Cutting - We will have a two- or three-man crew working on cutting railroad ties for the repair and ties needed to build track panels.

Crew 2: Track Panel Construction - We will need two or three people to build about a dozen straight track panels. Some of the panels will be used for the repair and the “Grandma Line” project.

Crew 3: “Bob” Work Crew - We will have a Bobcat onsite during the day. The Bobcat will be working on leveling gravel for Member Container 5 and bring gravel over to the west end to help with providing supplies for the repair work. We will need one or two people to help “Bob” while he is working around the railroad.

Crew 4: Track Repair Crew - We will need a bunch of people to help with the track repair on the west end. We will need people that can get on the ground and do tie replacement, track panel setting, and more. We will also need individuals that can’t get on the ground but can help ballasting and using the work train to pick up supplies from the red container work area and bring those items back to the worksite. We will need others that can do light work as well.

Crew 5: Fill in any place you can.

We’ve been getting a bunch of emails asking what they should bring. Here is a short list but if you can think of anything that you might think would be helpful bring it as well.

Battery powered drill

Flat head screwdriver and mallet

Knee pads or something to kneel on while on the ground

Metal rake and shovels (we have some onsite)

Tape measure (we have some onsite)

Good sense of humor

Lunch and plenty of water

Bad jokes

If you have any questions regarding what is needed, please contact Robby with any questions.

Read More
Latest News, Members Only North Georgia Live Steamers Latest News, Members Only North Georgia Live Steamers

Major track repair help requested for Saturday, February 24th at 8:30 a.m.

We are in need of repairing a 50-foot section of track on the west end of the railroad near the Nicols bridge. The plan is to move a switch and install a couple of new panels in order to smooth out a curve to switch area that was beginning to create some operational challenges on the railroad. If you have time between now and the 24th to go to the railroad we need three new straight panels built in order to make the 24th go quicker. Otherwise for those that are planning on coming out on Saturday, February 24th we plan on getting started around 8:30 a.m. with a full day of removing a switch, installing new ties, and track panels. The more that are available to help the faster we can complete the repair and make the railroad operational again.

We are in need of repairing a 50-foot section of track on the west end of the railroad near the Nicols bridge. The plan is to move a switch and install a couple of new panels in order to smooth out a curve to switch area that was beginning to create some operational challenges on the railroad. If you have time between now and the 24th to go to the railroad we need three new straight panels built in order to make the 24th go quicker. Otherwise for those that are planning on coming out on Saturday, February 24th we plan on getting started around 8:30 a.m. with a full day of removing a switch, installing new ties, and track panels. The more that are available to help the faster we can complete the repair and make the railroad operational again.

Some other items we will need help with including making sure we can get ballast from the ballast pile to the west end of the railroad to load the gondola and buckets so we can ballast the repaired area. If you have any questions regarding what is needed, please contact Robby with any questions.

Also note in order for the railroad to be completely operation for our March club fun day this work will need to be completed before March 2nd.

Read More
Members Only, Work Day North Georgia Live Steamers Members Only, Work Day North Georgia Live Steamers

A surprise work weekend for one of our members this past weekend. Check out the activity.

You never know when someone might show up unexpectedly and do some work around the railroad. This weekend John stop by for the weekend and did some work on the grandma line along with some artwork on member container #4.

Don’t forget about our next official workday, which is this Saturday, February 24th as we perform some major railroad repairs on the west end of the railroad starting at 8:30 a.m.

You never know when someone might show up unexpectedly and do some work around the railroad. This weekend John stop by for the weekend and did some work on the grandma line along with some artwork on member container #4.

Don’t forget about our next official workday, which is this Saturday, February 24th as we perform some major railroad repairs on the west end of the railroad starting at 8:30 a.m.

Read More
Latest News, Members Only, Work Day Scheduled North Georgia Live Steamers Latest News, Members Only, Work Day Scheduled North Georgia Live Steamers

Major track repair help requested for Saturday, February 24th at 8:30 a.m.

We are in need of repairing a 50-foot section of track on the west end of the railroad near the Nicols bridge. The plan is to move a switch and install a couple of new panels in order to smooth out a curve to switch area that was beginning to create some operational challenges on the railroad. If you have time between now and the 24th to go to the railroad we need three new straight panels built in order to make the 24th go quicker. Otherwise for those that are planning on coming out on Saturday, February 24th we plan on getting started around 8:30 a.m. with a full day of removing a switch, installing new ties, and track panels. The more that are available to help the faster we can complete the repair and make the railroad operational again.

We are in need of repairing a 50-foot section of track on the west end of the railroad near the Nicols bridge. The plan is to move a switch and install a couple of new panels in order to smooth out a curve to switch area that was beginning to create some operational challenges on the railroad. If you have time between now and the 24th to go to the railroad we need three new straight panels built in order to make the 24th go quicker. Otherwise for those that are planning on coming out on Saturday, February 24th we plan on getting started around 8:30 a.m. with a full day of removing a switch, installing new ties, and track panels. The more that are available to help the faster we can complete the repair and make the railroad operational again.

Some other items we will need help with including making sure we can get ballast from the ballast pile to the west end of the railroad to load the gondola and buckets so we can ballast the repaired area. If you have any questions regarding what is needed, please contact Robby with any questions.

Also note in order for the railroad to be completely operation for our March club fun day this work will need to be completed before March 2nd.

Read More
Club Fun Day, Live Steam Railroad Club, Members Only North Georgia Live Steamers Club Fun Day, Live Steam Railroad Club, Members Only North Georgia Live Steamers

Our 2nd Almost Monthly Club Fun Day of 2024 will be Saturday, March 2nd

Our 2nd Almost Monthly Club Fun Day will be Saturday, March 2nd. The day is intended for club members, guests, and those who are in the hobby to come out and enjoy a day of running trains. Come when you want and stay as long as you want. If you plan on coming out, please let us know by clicking here.

Our 2nd Almost Monthly Club Fun Day will be Saturday, March 2nd. The day is intended for club members, guests, and those who are in the hobby to come out and enjoy a day of running trains. Come when you want and stay as long as you want. If you plan on coming out please let us know by clicking here.

Read More

Upcoming NGLS Club Fun Days and Fall meet dates

Mark your calendar for the 2024 club fun days happening with North Georgia Live Steamers. These days are for club members, invited, guests, and those in the live steam hobby. The remaining club fun day events are scheduled on March 2nd, June 1st, June 15th, August 24th, September 14th, and November 30th. Our Fall Meet will now move the last weekend in October. The dates for the 2024 meet are Thursday, October 24th through Sunday, October 27th. For more information and to register click on Fall Meet. For the latest on what’s going on with our club fun days visit our website site or contact Robby Mossman for more details.

Note: Club Fun Days are NOT public run day events. These days are reserved for our group to enjoy the railroad with friends, family, and invited guests.

Mark your calendar for the 2024 club fun days happening with North Georgia Live Steamers. These days are for club members, invited, guests, and those in the live steam hobby. The remaining club fun day events are scheduled on March 2nd, June 1st, June 15th, August 24th, September 14th, and November 30th. Our Fall Meet will now move the last weekend in October. The dates for the 2024 meet are Thursday, October 24th through Sunday, October 27th. For more information and to register click on Fall Meet. For the latest on what’s going on with our club fun days visit our website site or contact Robby Mossman for more details.

Note: Club Fun Days are NOT public run day events. These days are reserved for our group to enjoy the railroad with friends, family, and invited guests.

Read More
Latest News, Members Only, Railroad Projects North Georgia Live Steamers Latest News, Members Only, Railroad Projects North Georgia Live Steamers

Updated track plan has been posted on our website. Check it out.

The past several years we have taken on a lot of projects and completed many of them. Because of the completion of those projects an updated track plan diagram has been posted which shows what has been completed and what is currently planned or being worked on around the railroad. To date we have almost 2 miles of track on the ground with nearly 1 mile of it being mainline.

For a complete list of current and future projects don’t forget to visit our projects web page listing all of what we are planning or thinking about.

The past several years we have taken on a lot of projects and completed many of them. Because of the completion of those projects an updated track plan diagram has been posted which shows what has been completed and what is currently planned or being worked on around the railroad. To date we have almost 2 miles of track on the ground with nearly 1 mile of it being mainline.

For a complete list of current and future projects don’t forget to visit our projects web page listing all of what we are planning or thinking about.

Read More
Latest News, Members Only North Georgia Live Steamers Latest News, Members Only North Georgia Live Steamers

The next club meeting will be on Saturday, February 3rd at 1 p.m. at the railroad

The next club meeting will be on Saturday, February 3rd at 1 p.m. at the site. We look forward to seeing everyone at the meeting.

In other news the clubhouse and workshop project is moving forward. Over the next few weeks we are planning on hooking up the power and water line. We could use some help from those who are good with electrical wiring to help us with the hook up. We are also needing help preparing the site next to member container 3 so we can move the blue container to its new home. The prep work will require us to level and remove excess gravel from the area ahead of scheduling a truck to move the container. Weather permitting and assuming the ground is not soft we would like to get the above items completed by the end of February. If you are able to work on this project, please let us know and remember work can be done at any time and does not require work to be done on a Saturday.

One final thing we have significant track repair that needs to be completed on the west end of the railroad near the Nicol bridge. We have a scheduled workday on Saturday, February 24th to start working on this repair. We will need help with building a few track panels and replacing ties. The more help we can get the quicker we can get the railroad back up and operational.

The next club meeting will be on Saturday, February 3rd at 1 p.m. at the site. We look forward to seeing everyone at the meeting.

In other news the clubhouse and workshop project is moving forward. Over the next few weeks we are planning on hooking up the power and water line. We could use some help from those who are good with electrical wiring to help us with the hook up. We are also needing help preparing the site next to member container 3 so we can move the blue container to its new home. The prep work will require us to level and remove excess gravel from the area ahead of scheduling a truck to move the container. Weather permitting and assuming the ground is not soft we would like to get the above items completed by the end of February. If you are able to work on this project, please let us know and remember work can be done at any time and does not require work to be done on a Saturday.

One final thing we have significant track repair that needs to be completed on the west end of the railroad near the Nicol bridge. We have a scheduled workday on Saturday, February 24th to start working on this repair. We will need help with building a few track panels and replacing ties. The more help we can get the quicker we can get the railroad back up and operational.

Read More
Latest News, Members Only, Work Day North Georgia Live Steamers Latest News, Members Only, Work Day North Georgia Live Steamers

Get involved in the "Grandma Line" project

Are you looking for a winter project around the railroad you can get involved in? The “Grandma Line” project team is looking for volunteers to come out and help make some major progress on the long talked about “Grandma Line.” If you are interested in help please contact John T. for more information regarding the workday schedule. The crew will need help with everything from building track panels, switches, moving dirt, and building a retaining wall. Opportunities for everyone to get involved.

This is just one of several projects going on around the railroad this winter so don’t hesitate to get involved.

Are you looking for a winter project around the railroad you can get involved in? The “Grandma Line” project team is looking for volunteers to come out and help make some major progress on the long talked about “Grandma Line.” If you are interested in help please contact John T. for more information regarding the workday schedule. The crew will need help with everything from building track panels, switches, moving dirt, and building a retaining wall. Opportunities for everyone to get involved.

This is just one of several projects going on around the railroad this winter so don’t hesitate to get involved.

Read More
Members Only, Latest News North Georgia Live Steamers Members Only, Latest News North Georgia Live Steamers

Trains, Trains, Trains! at Southern Museum of Civil War and Locomotive History 2024 Recap

The Trains, Trains, Trains event is in the books and what a great turn out for the weekend event at the Southern Musuem for Civil War and Locomotive history. This year we had the club steamer and the new Chesapeake & Ohio consolidation on display, and both created a lot of conversation and surprises by many that they were real steam engines. A shout out to all of the club members who came out to help make the event such a success. We look forward to seeing the many visitors we met this past weekend at our public run days starting this spring.

Our next club meeting with be this Saturday, February 3rd at the site at 1 p.m. Our next big club workday will be on Saturday, February 24th in order to repair a 50-foot section of track on the west side of the railroad near the Nicol bridge. Also note the club calendar has been updated so make sure you check out the latest information on our calendar page or check out the latest below the pictures for what is coming up next on our calendar.

The Trains, Trains, Trains event is in the books and what a great turn out for the weekend event at the Southern Musuem for Civil War and Locomotive history. This year we had the club steamer and the new Chesapeake & Ohio consolidation on display, and both created a lot of conversation and surprises by many that they were real steam engines. A shout out to all of the club members who came out to help make the event such a success. We look forward to seeing the many visitors we met this past weekend at our public run days starting this spring.

Our next club meeting with be this Saturday, February 3rd at the site at 1 p.m. Our next big club workday will be on Saturday, February 24th in order to repair a 50-foot section of track on the west side of the railroad near the Nicol bridge. Also note the club calendar has been updated so make sure you check out the latest information on our calendar page or check out the latest below the pictures for what is coming up next on our calendar.

Photo Recap

Read More
Work Day, Railroad Projects, Members Only, Latest News North Georgia Live Steamers Work Day, Railroad Projects, Members Only, Latest News North Georgia Live Steamers

Here is a list of current workdays and projects on the calendar for the month and beyond.

Over the course of the month, we plan on working on a project or two around the railroad. In order to give everyone a chance to find a project they are interested in helping with we are sending out monthly emails listing projects and other activities going on around the railroad. Don’t forget to invite family, friends, neighbors, and anyone you know who likes trains. For more details about some of the projects we are working on click on the “Railroad Project List” button below for a complete list. Don’t forget to bring tools, lunch, plenty to drink, and a good sense of humor. Don’t forget we have other fun days planned throughout the month and year as well so don’t forget to visit our calendar page for a complete list of everything going on around the railroad.

Over the course of the month, we plan on working on a project or two around the railroad. In order to give everyone a chance to find a project they are interested in helping with we are sending out monthly emails listing projects and other activities going on around the railroad. Don’t forget to invite family, friends, neighbors, and anyone you know who likes trains. For more details about some of the projects we are working on click on the “Railroad Project List” button below for a complete list. Don’t forget to bring tools, lunch, plenty to drink, and a good sense of humor. Don’t forget we have other fun days planned throughout the month and year as well so don’t forget to visit our calendar page for a complete list of everything going on around the railroad.

All Dates are subject to change and weather conditions

Read More
Members Only North Georgia Live Steamers Members Only North Georgia Live Steamers

Progress on rebuilding the new NGLS electric switcher

Some exciting progress has been made on rebuilding the electric switcher. Dave L. installed new motor, controller, batteries, and a new paint job. Things are coming together nicely, and I know we all look forward to seeing this locomotive operating around the railroad in 2024. Big shout out to Dave for his work on this project.

Some exciting progress has been made on rebuilding the electric switcher. Dave L. installed new motor, controller, batteries, and a new paint job. Things are coming together nicely, and I know we all look forward to seeing this locomotive operating around the railroad in 2024. Big shout out to Dave for his work on this project.